Publications

  1. Refractories and cooling of german Blast Furnaces

Course held at CESSID, French Institute of higher Studies of steelmaking,

Oct. 1992

 

  1. Usinor Sacilor philosophy and experience about Blast Furnace burden quality

European Blast Furnace Committee Meeting in Rautaruukki Raahe Finland

Mai 1993

 

  1. Cast-House operating practice

Working group of Usinor Engineers

French Ironmaking Comittee Session

Jan. 1994

 

  1. Fundamental aspects and industrial practice of high coal injection in the Blast

Furnace within Usinor Sacilor Group.

1st Intern. Congress of Science and Technology of Ironmaking, Sendai Japan

March 1994

 

  1. Aspects of the casthouse practice at Dillinger Hüttenwerke AG Rogesa Blast Furnaces

European Blast Furnace engineers meeting VOEST-Alpine Stahl Linz

Sept. 1994

 

  1. Integrated use of Burden-Profile-Probe and In-Burden-Probe for gas flow control in the Blast Furnace

54th Ironmaking Conference, Nashville, TN

April 1995

 

  1. Blast furnace Ironmaking, state of the art

La Révue de Métallurgie-CIT

Oct. Nov. 1995

 

  1. Measures for increasing productivity at the Blast Furnace

Iron and Steelmaking Conference, Düsseldorf Germany

Nov. 1995

 

  1. Supply of the Steelshops of Dillinger Hütte and Saarstahl AG by the Blast

Furnaces of ROGESA Dillingen.

Session of the french Ironmaking and Steelmaking Comittee, Paris

March 1997

 

  1. Fin de campagne et redémarrage du Haut Fourneau 5 de Dilling

ATS Commission Fonte, Fos sur Mer Oct. 1997

 

  1. Influence of the quality of the burden material on the gas flow in the Blast Furnace

Course held at CESSID, French Institute of higher Studies of steelmaking

Sept. 1999

 

  1. Measures for increasing the productivity of Blast Furnaces

59th Ironmaking Conference Pittsburgh, PA

May 1999

 

  1. Investigation of influence of cokes with different quality on the Blast Furnace operation

4th European Coke and Ironmaking Congress, Paris

June 2000

 

  1. Cost reduction and increase of productivity by transition from 3 to 2 Blast Furnaces operation at Rogesa Dillinger Hüttenwerke

XXXII Seminario de reducao de minerio de ferro e matérias-primas, Vila Velha, ES Brazil 2002

 

  1. Anforderungen an Reststoffe für das Einblasen in den Hochofen. Stahl und Eisen 123 (2003) 1


  2. Relining and enlargement of Rogesa No. 4 blast furnace in 2003

Revue de Métallurgie, 102, july –august 2005

 

  1. Investigation of chlorine and alkali impacts on the blast furnace operation

Proceedings 5th European coke and ironmaking congress, ECIC Stockholm 2005

 

  1. Improvement of the environmental situation of blast furnace BF 4 at Rogesa, Dillingen-Germany

Proceedings 5th European coke and ironmaking congress, ECIC Stockholm 2005

 

  1. Optimized tap hole operation at BF 4 in Dillingen

Proceedings 5th European coke and ironmaking congress, ECIC Stockholm 2005

 

  1. Developments in Sinter Technology

Presented at the STAHL 2006 Conference on 9 Novenber in Düsseldorf/Germany

 

  1. Commissioning and first operational Results of the New Gas Cleaning Installation with the Paul Wurth Entrained Flow Absorber (EFA) at ROGESA No. 3 Sinterstrand

Presented at Journées Siderurgiques Internationales 14 and 15 december Paris/France

 

  1. Investigation of influentional parameters on BF operations and wear conditions of No. 5 Blast Furnace after its inner volume enlargement

Presented at AISTech 2007 Indianapolis

 

  1. Blast Furnace Hearth Protection by Simultaneous Injection of Pulverized Coal and Synthetic Titanium Dioxide Products

Presented at AISTech 2008 Pittsburgh

 

  1. Coinjection of synthetical TiO2 with premixed pulverized coal for preventive hearth protection of ROGESA Blast Furnaces in Dillingen Germany

Presented at the 39. ABM Ironmaking Congress Ouro Preto, Brazil Nov.2009

 

  1. Blast Furnace hearth protection by simultaneous injection of pulverized coal and synthetic titanium dioxide products

Presented at the AISTech 2009 in St. Louis

 

  1. Operation Results of the new Waste Gas Treatment Facility at ROGESA’s No. 2 Sinterplant – the EFA™ Process

Presented at the AISTech 2010, Pittsburgh

 

  1.  2nd reline of ROGESA Blast Furnace No 5 in Dillingen Germany

Presented at the 6th European Coke and Ironmaking congress, Düsseldorf 2011

 

  1. Results of the Coinjection of PCI and Synthetic Titanium Dioxide Products for Protection of the Hearth of Blast Furnaces after Stop for Relining

Presented at the 6th European Coke and Ironmaking congress, Düsseldorf 2011

Presented at the 30th JSI, 18-19 December 2012, Paris-France

 

  1. Campaign life extension at ROGESA Blast Furnaces by coinjection of PCI and Titanium dioxide

Presented at the AISTec 2012, Atlanta

 

  1. Intermediate Repair of the bosh cooling system of ROGESA No.5 Blast Furnace in 2013

Presented at the AISTec 2014, Indianapolis

 

  1. Economical aspects of synthetic TiO2 products prolonging the campaign of blast furnaces

Stahl und Eisen 11/2016

 

  1. Development and Implementation of new Measuring and Monitoring Systems to Support BF Control. Lin, Rausch, Hartig, Wu

BHM 2016